Once you decide what to build, execution should never slow you down.
Every part becomes a line someone can act on.
Pick a product and take it apart. One item has run late, and you see exactly what it stops. Then send the request, read the answers, and award the work.
Supply risk
0%Bodies —Scene LOADING
This view needs 3D support in the browser. The bill of materials beside it is the same one.
ExpandPartQtyUnitTotalStatus
Total 0.00
Source
A tree, not a list
Assemblies contain parts. Open the propulsion assembly and you find the motor; open the motor and you find its stator and its bell
Hovering an assembly finds all of it at once. One line at the top level can own eight bodies in space
Cost rolls up. An assembly shows the sum of everything inside it, the way a bill of materials does
Taking the product apart runs in reverse assembly order: the last line comes off first and the base leaves last
From a red row to an order
A red row says what is wrong, in the words a buyer would use: the promised date passed and nothing is confirmed inbound
An amber row says what it is waiting for, naming the line that blocks it
Every line carries its next move and the role that owns it
The same state shows in space: the late body is coloured and everything downstream of it dims
The red row opens the sourcing lane. Ask three suppliers, watch the answers land, compare price against lead time, award one
The award closes the loop. The line goes on order and every part that was waiting on it comes back
What is real and what is not
The commercial data is illustrative. Suppliers, prices and lead times are written for the demonstration
The part identities are real where the source model names them, and the geometry is exactly what the model file contains
The models are credited by name, author and licence in the line above, each linking to its source and to its licence text
Nothing acts on its own. The request, the award and every step that changes the plan are a person clicking; the page never decides for anyone
This was one product and three suppliers we made up.
On a real programme it is your parts, your suppliers and your dates — and the same thing
happens: one line slips, and everything behind it waits. TERIO is where that stops being a
surprise you find out about late.